The Combined Cycle Power Plant is located within the Pego Power Generation Complex, owned by Tejo Energia S.A. The Pego Combined Cycle Power Plant was built on the site originally intended for the construction of two additional coal-fired units that were never developed.
The Combined Cycle Power Plant shares several auxiliary services with the former coal-fired power plant, such as:
• access and security
• fire-fighting systems
• environmental monitoring equipment
• auxiliary boiler
• industrial water supply
• demineralisation and effluent treatment systems
Elecgas’s shareholding structure is 50% ENGIE and 50% ENDESA.